M&L Technical Systems helped Del Conca USA establish a 320,000 sq ft tile manufacturing plant and a 12,000 sq ft showroom and office building in record time. The buildings were under construction from March 2013 to January 2014, a 10-month time period. These facilities include a multi-building and multi-control panel system completely networked together to act as one functioning unit with the ability to monitor and control the system from any building onsite.
Systems:
- Fire Alarm